Phase 1

Phase I of BPGIC Al-Fujairah Terminal was completed and commissioned in November 2017. Phase I consists of a total of fourteen tanks with an overall storage capacity of 398,600m³. Four tanks, with 41,500m³ capacity each, are designed for storing Black Oil products and the remaining ten tanks (four of 12,400m³ capacity each and six of 30,500m³ capacity each) are designed for storing White Oil products with a flexibility of interchanging the products in either group of tanks. Apart from the construction of storage tanks , all associated infrastructure including 4 jetty lines to POF and utilities are also built and commissioned as part of Phase I.